23”W x 30”Back Ht x 22”D
Frame in ss with matt brass, padding in oak veneer with a PU matt stain finish.
Upholstered in velvet fabric.
Customisation available upon request.
Production lead time 8 weeks.
21”W x 35”Back Ht x 21”D
Frame in oak wood with PU matt stain finish.
Upholstered in blended fabric.
Customisation available upon request.
Production lead time 8 weeks.
24”W x 41”Back Ht x 23”D
Legs in oak wood with a matt PU stain finish.
Upholstered in velvet fabric.
Customisation available upon request.
Production lead time 8 weeks.
20”W x 17”Seat Ht/35”Back Ht x 23”D
Legs in oak wood with a PU matt stain finish.
Upholstered in faux leather.
Customisation available upon request.
Production lead time 8 weeks.
60" W x 30" H x 24" D
Living tree wood / Mango wood in natural polish and SS in matt brass
Customisation available upon request.
Production lead time 8 weeks.
Note : The wood changes colour & develops cracks, due to its own nature.
This is not a manufacturing oversight.
60”W x 30”H x 12”D
Top in oak veneer with matt stain.
Legs in SS with matt brass finish.
Customisation available upon request.
Production lead time 8 weeks.
60" W x 30" H x 16" D
Wooden frame with lacquer.
Legs in SS with matt brass finish.
Customisation available upon request.
Production lead time 8 weeks.
W 72” x D 84” x H 14”
Upholstered in faux leather.
Base in SS with PU colour finish.
Does not have storage.
Customisation available upon request.
Production lead time 8 weeks.
(Mattress is not included with this bed)
MATTRESS SIZE
W 72” x D 84” x H 14”
Colour Lamination & Headboard upholstery in velvet fabric.
Pull out drawers on both sides.
Customisation available upon request.
Production lead time 8 weeks.
(Mattress is not included with this bed)
31” W x 15”Seat Ht/30”Back Ht x 33” D
Frame in oak wood with a black pu matt stain finish.
Upholstered in wool fabric.
Customisation available upon request.
Production lead time 8 weeks.
MATTRESS SIZE
W 72” x D 78” x H 15”
Stained oak veneer & railing in SS
Customisation available upon request.
Production lead time 8 weeks.
(Mattress is not included with this bed)