Shop

Bridge Console

Console

Bridge Console

₹3,46,000
66" W x 32" H x 20" D Base SS with matte brass finish. Top cladded with texture brass sheet. Customisation available upon request. Production lead time 8 weeks.
Platform Bed

Beds

Platform Bed

₹4,88,000
98" W x 13" H x 94" D Headboard: 126" W x 24"/37" H Platform in oak venner. Headboard in terrazzo and bolsters upholsterd in cotton blend fabric. Manual hydrolic storage. This price is not included mattress cost. Customisation available upon request. Production lead time 8 weeks.
Tropical Bed

Beds

Tropical Bed

₹4,32,000
74" W x 13" H x 82" D Headboard -108" W x 34" H x 6" D Upholstery in cotton blend fabirc Frame in oakwood with water based PU finish. With manual hydrolic storage. Customisation available upon request. Production lead time 8 weeks.
Terrazzo Sofa
Terrazzo Sofa

Sofas

Terrazzo Sofa

₹2,61,000
108" W x 17" Seat Ht / 26" Back Ht x 36" D Upholstered in Bhagalpur silk. Arms are inset with ribbed terrazzo panels. Customisation available upon request. Production lead time 8 weeks.
Tropical Sofa
Tropical Sofa

Sofas

Tropical Sofa

₹2,41,000
108″ W × 17″ Seat H / 28″ Back H × 36″ D Upholstered in cotton. Oak wood with matte water based PU finish. Customisation available upon request. Production lead time 8 weeks.
Bhramaputra Dining Table ( veneer)

Dining Tables

144”W X 30”H X 48”D Top in oak veneer and granite. Base in solid oak with matte water based PU finish. Customisation available upon request. Production lead time 8 weeks.
Line Art 2

Artifacts

Line Art 2

₹1,22,000
40" W x 60" H x 2" D Mild Steel with black powder coating. Customisation available upon request. Production lead time 8 weeks.
Line Art 1

Artifacts

Line Art 1

₹1,70,000
48" W x 96" D x 2" D Mild Steel with black powder coating. Customisation available upon request. Production lead time 8 weeks.
Tube Bedside Table

Centre Tables

Tube Bedside Table

₹1,08,000
30”W X 21“H X 18“D Frame in PU colour matte and SS with matte brass finish. Drawers facia stone veneer. Customisation available upon request. Production lead time 8 weeks.

Product Enquiry