Shop

Chatai Sideboard
Chatai Sideboard

Sideboards

Chatai Sideboard

661,600
96”W X 30”H X 18”D Hammered brass sheet, laminated from inside. Base in SS with matt brass sheet. Customisation available upon request. Production lead time 8 weeks.
Panel Profile Chair
Panel Profile Chair

Chairs

Panel Profile Chair

173,600
27”W X 24”H X 30”D Upholstered in raw silk. Frame in lacquer. Customisation available upon request. Production lead time 8 weeks.
Deco Gadda (Day Bed)
Deco Gadda (Day Bed)

Sofas

Deco Gadda (Day Bed)

1,030,000
120”W X 28”H X 84”D 5 Seater day bed upholstered in raw silk. Base and ledge in lacquer finish. Customisation available upon request. Production lead time 8 weeks.
Split Sofa
Split Sofa

Sofas

Split Sofa

578,500
114”W X 28”H X 36”D 3 Seater sofa upholstered in raw silk. Hollowed bolster split by a brass plate that extends down as the leg. Customisation available upon request. Production lead time 8 weeks.
Panel Bed
Panel Bed

Beds

Panel Bed

358,400
Mattress size: 72”W x 8”H x 77”D Headboard size: 84”W x 46”H Headboard in boucle fabric. Base in oak veneer with beige matt stain. Top opening hydraulic box storage. This price is not included mattress cost. Customisation available upon request. Production lead time 8 weeks.
Tube Bed
Tube Bed

Beds

Tube Bed

484,700
Mattress size: 69"W x 8"H x 81"D Bed size: 39"W x 16"Seat Ht /Headboard size: 45" Ht x 87"D Fully upholstered with texture fabric. Storage in remote hydraulic system. Customisation available upon request. Production lead time 8 weeks.
Snug Dining Chair
Snug Dining Chair

Chairs

Snug Dining Chair

67,700
20”W x 18”Seat Ht/34"Back Ht x 24”D Frame in solid oak wood with walnut matt stain, Legs caps in SS with matt brass finish. Upholstered in blended fabric. Customisation available upon request. Production lead time 8 weeks.
Fluid Profile Chair
Fluid Profile Chair

Chairs

Fluid Profile Chair

187,200
33”W X 15”Seat Ht /29”Back Ht X 30”D Upholstered in boucle fabric. Skirting in ss with a black matt finish. Customisation available upon request. Production lead time 8 weeks.
Panel Console
Panel Console

Console

Panel Console

113,800
57”W x 30”H x 16”D Top in marble. Base in pu matt colour & oak veneer with matt stain. Inlay in ss with nickel finish. Customisation available upon request. Production lead time 8 weeks.
Fin Center table
Fin Center table

Centre Tables

Fin Center table

169,750
44”W x 14”H x 44”D Top in hammered metal and clear glass. Legs in SS with matt brass finish. Customisation available upon request. Production lead time 8 weeks.
Pillar Console
Pillar Console

Console

Pillar Console

221,200
60”W x 30”H x 15”D Finish in beaten brass. Customisation available upon request. Production lead time 8 weeks.
Bridge Sofa
Bridge Sofa

Sofas

Bridge Sofa

271,400
115” W x 17” Seat Ht/31” Back Ht x 35”D 3-seater sofa fully upholstered in raw silk. Customisation available upon request. Production lead time 8 weeks.

Product Enquiry