22" DIA x 26" H
16" DIA x 22" HTop in Oak veneer with water based pu.
Base in MS with powder-coated black.
Customisation available upon request.
Production lead time 8 weeks.
16" W x 24" H x 24" DRaintree wood/ Mango wood with natural matt water based pu.
Legs in SS with matt Brass finish.
Customisation available upon request.
Production lead time 8 weeks.Note : The wood changes colour & develops cracks, due to its own nature.
This is not a manufacturing oversight.
12" W x 21" H x 19” DTop in bronze beaten metal.
Frame in ss with matt brass finish.
Customisation available upon request.
Production lead time 8 weeks.
24”Dia x 10”H
30”Dia x 14”HFinish in rain tree wood/mango wood with natural matt water based PU finish.
Customisation available upon request.
Production lead time 8 weeks.Note : The wood changes colour & develops cracks, due to its own nature.
This is not a manufacturing oversight.
20" DIA x 20" HTop in burl veneer with lamination.
Base in SS with matt brass finish.
Customisation available upon request.
Production lead time 8 weeks.