Centre Tables

Slit N.O.T Set

Centre Tables

21”W / 16"DIA X 21” /17”HFinish in oak laminate, legs in MS powder coat. Customisation available upon request. Production lead time 8 weeks.
Tray N.O.T.

Centre Tables

Tray N.O.T.

33,600
22" DIA x 26" H 16" DIA x 22" HTop in Oak veneer with water based pu. Base in MS with powder-coated black. Customisation available upon request. Production lead time 8 weeks.
Pipe Side Table

Centre Tables

16" W x 24" H x 24" DRaintree wood/ Mango wood with natural matt water based pu. Legs in SS with matt Brass finish. Customisation available upon request. Production lead time 8 weeks.Note : The wood changes colour & develops cracks, due to its own nature. This is not a manufacturing oversight.
MR. T OCC TABLE

Centre Tables

18" W x 23” H x 18” DFinish in black colour lamination with casters. Customisation available upon request. Production lead time 8 weeks.
Slide N.O.T

Centre Tables

Slide N.O.T

42,300
12" W x 21" H x 19” DTop in bronze beaten metal. Frame in ss with matt brass finish. Customisation available upon request. Production lead time 8 weeks.
Deco side table

Centre Tables

20" DIA x 21" HBlack colour lamination. Customisation available upon request. Production lead time 8 weeks.
Living Tree Side Table Set

Centre Tables

24”Dia x 10”H 30”Dia x 14”HFinish in rain tree wood/mango wood with natural matt water based PU finish. Customisation available upon request. Production lead time 8 weeks.Note : The wood changes colour & develops cracks, due to its own nature. This is not a manufacturing oversight.
Deco Coffee Table

Centre Tables

42”Dia x 12”HFinish in pre laminate. Customisation available upon request. Production lead time 8 weeks.
Round Side Table

Centre Tables

18" DIA x 21"HTop in stone veneer. Legs in SS with matt brass finish. Customisation available upon request. Production lead time 8 weeks.
Ellipse OCC Table

Centre Tables

20" DIA x 20" HTop in burl veneer with lamination. Base in SS with matt brass finish. Customisation available upon request. Production lead time 8 weeks.

Product Enquiry