60" W x 30" H x 24" D
Living tree wood / Mango wood in natural polish and SS in matt brass
Customisation available upon request.
Production lead time 8 weeks.
Note : The wood changes colour & develops cracks, due to its own nature.
This is not a manufacturing oversight.
16" W x 24" H x 24" D
Raintree wood/ Mango wood with natural matt water based pu.
Legs in SS with matt Brass finish.
Customisation available upon request.
Production lead time 8 weeks.
Note : The wood changes colour & develops cracks, due to its own nature.
This is not a manufacturing oversight.
60”W x 30”H x 12”D
Top in oak veneer with water based pu.
Legs in SS with matt brass finish.
Customisation available upon request.
Production lead time 8 weeks.
72” W X 12” H X 30” D
Top in stone veneer and laminated stone venner.
Splited by SS plate with matte brass finish.
Customisation available upon request.
Production lead time 8 weeks.
55”W X 55”H X 16”D
Burl matte veneer and SS with matte brass finish.
Base in Lacquer.
Customisation available upon request.
Production lead time 8 weeks.
96”W X 22.5”H X 16”D
Burl matt veneer.
Base in colour lamination and laminated from inside.
Customisation available upon request.
Production lead time 8 weeks.
47”DIA X 15”D
Top in Bidasar marble.
Base in solid oak wood with water PU stain finish.
Customisation available upon request.
Production lead time 8 weeks.
141”W X 30”H X 47”D
Table top in backpainted glass.
Wooden carved legs with lacquer finish.
Customisation available upon request.
Production lead time 8 weeks.